AUTOMATED METER READING IMPLEMENTATION

WHERE IS MY METER READER?

In July 2005, the decision was made to upgrade from manual read to radio read water meters throughout the service area.  The equipment upgrades were from Badger Meter Corporation and Orion RF radio read system.  The decision was made based on the ability of the automated system to reduce man hours needed for reading, improve accuracy and decrease meter reader training.  The implementation plan was designed around a 4 year schedule.

Meters are now read using the new system.  This upgrade has exceeded our expectations and thus far we had minimal problems with the radio transmitter units now in service.

Peoples Water Service takes progressive measures to ensure that a reliable supply of high-quality water is available for current and future generations. Some of these measures include water main replacement projects.  As a valued customer, we are pleased to share with you our plans for capital investment in main replacements.  Each year we invest in the replacement of water mains and service lines that are reaching the end of their useful life. 

The following is a list of our planned main replacement projects for the fiscal year starting October 2009 and ending August 2010.


October-November-December 2009
*Replace 600' of 2" galvanized main with 3" PVC at the 200 block of Carys Lane

*Replace 680' of 2" galvanized main with 3" PVC at Pou Station


January-March-April 2010

*Replace 260' of 4" AC main with 4" PVC at Sunset Avenue between Valencia Drive and Chattman Street

*Replace 1,280' of 2" galvanized main with 3" PVC at Waycross Avenue from Gulf Beach Highway to Sunnyside Road

 

June-July-August 2010

*Replace 900' of 2" galvanized main with 3" PVC on Chattman Street from Sunset Avenue to Valencia Street

*Replace 1,250' of 4" AC main with 4" PVC at South Loop Road